logo
 
spacer
 
 manageing your building takes lots of energy... we can help
Power System Services
services
Boiler Plant
Preventative Maintenance
Boiler Plant Optimization
15 Point Energy Efficiency Check
$399 Special
Burner Overhaul and Repairs
Spring and Winter Overhauls
$899 Special
Energy Efficiency Testing
Combustion Analysis
FREE limited time offer
Oil to Gas Conversions
NYC Licensed Installer
High Efficient Hot Water
Commercial and Multifamily
DEP/DAR Pre Inspections
DEP Violation removal
Steam Trap/Vacuum Repairs
Thermal Imagery Testing
Remote Monitoring and Controls
Internet and Paging Systems


 
services

Boiler Plant Preventative Maintenance (PM) Agreements whether gas or fuel oil, PM contracts are available for most burner equipment.   Our technicians have years of experience in maintaining water-tube, fire-tube, sectional and furnace bank equipment manufactured by companies such as: Federal, Rockmills, Weil Mclain, Cleaverbrooks, Slantfin, AO Smith and more!   

Our PM program is designed to insure your system operates at peak efficiency throughout the year.  Services include performing a complete full service overhaul of the main combustion system components, ancillary compressors and combustion efficiency test to ensure proper adjustments have been made to maximize operations during low/high fire.   In additions, a monthly plus option is available with each contract in which our technician will perform a monthly control tune up, plus one annual overhaul. 

For central plant operations, NGEM can provide an on-site fully certified staff to operate heating and/or cooling systems under special contracted service agreement.  

Service visits are performed by qualified in-house technicians.  Your equipment will be entered into our computerized maintenance system which will create a history file and prompt us to notify you ahead of time when your facilities are coming due for service.  Our 24 hour emergency services will ensure you that your operations will continue to run efficiently throughout the year.

 

 
   
 
spacer
Copyright ©2009 National Grid